OPTIMAL SYSTEMS GmbH

Client: OPTIMAL SYSTEMS GmbH
Architect: Bauplanungsbüro Dipl.-Ing. Störmer Weiss
Work scope: Demolition, Dry Construction, Doors, Partition Wall System, Raised Floor, Plastering,
Construction period: From April 2012 to May 2012, April 2013
back